摘要
结合佛山高明区现代有轨电车一期工程,对轨道结构设计方案进行了介绍,并对工程设计的重难点和解决方案进行了阐述,最后对现代有轨电车平交道口的加强型轨道结构方案提出了钢槽+环氧树脂+砂浆层的优化方案。
Combined with the modern tram project in Gaoming District of Foshan City, the main schemes of track structure design are introduced, key points and difficulties in the design and corresponding solutions are elaborated. On this basis, an improvement scheme of groove rail + epoxy resin +mortar layer is proposed to strengthen the rail structure at tram intersections.
作者
陈睿颖
CHEN Ruiying(Shanghai Municipal Engineering Design Institute(Group)Co.,Ltd.,200092,Shanghai,China)
出处
《城市轨道交通研究》
北大核心
2019年第S01期85-87,共3页
Urban Mass Transit