期刊文献+

松江现代有轨电车T1线新车公路节点方案研究 被引量:1

Research on Xinche Highway Node Scheme for Songjiang Tram Line T1
下载PDF
导出
摘要 以上海松江现代有轨电车T1线新车公路节点为对象,介绍了该节点下穿沈海高速公路、有轨电车轨道下方预留新车公路地道,以及避让高压燃气管和大量电力等管线、改造闵申路高架下穿上海轨道交通22号线门墩等多个难点。分析江了T1线新车公路节点的解决对策,从中获得了一些重要的启示,以供现代有轨电车工程中复杂节点的建设作参考。 The Xinche Highway nodes on Songjiang tram Line T1 is taken as the research target, the multiple difficulties are introduced, such as the reserved tunnel under-passing G15 Highway for Xinche Highway tram line, the project of leaving high pressure gas pipe and large number of power lines, the rebuilding of Minshen Elevated Road and the project under-passing the gate pier of metro Line 22. Solutions to Xinche Highway nodes for Songjiang tram Line T1 is analyzed, some important enlightenment are obtained, which could be used as references for the construction of tram lines at complex nodes.
作者 姚幸 YAO Xing(Shanghai Urban Construction Design and Research Institute(group)Co.,Ltd.,200125,Shanghai,China)
出处 《城市轨道交通研究》 北大核心 2019年第S01期91-95,共5页 Urban Mass Transit
关键词 现代有轨电车 松江T1线 下穿高速公路 预留地道 下穿轨道交通线 modern tram Songjiang T1 Line under-passing expressway reserved tunnel under-passing metro line
  • 相关文献

同被引文献1

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部