摘要
以上海松江现代有轨电车T1线新车公路节点为对象,介绍了该节点下穿沈海高速公路、有轨电车轨道下方预留新车公路地道,以及避让高压燃气管和大量电力等管线、改造闵申路高架下穿上海轨道交通22号线门墩等多个难点。分析江了T1线新车公路节点的解决对策,从中获得了一些重要的启示,以供现代有轨电车工程中复杂节点的建设作参考。
The Xinche Highway nodes on Songjiang tram Line T1 is taken as the research target, the multiple difficulties are introduced, such as the reserved tunnel under-passing G15 Highway for Xinche Highway tram line, the project of leaving high pressure gas pipe and large number of power lines, the rebuilding of Minshen Elevated Road and the project under-passing the gate pier of metro Line 22. Solutions to Xinche Highway nodes for Songjiang tram Line T1 is analyzed, some important enlightenment are obtained, which could be used as references for the construction of tram lines at complex nodes.
作者
姚幸
YAO Xing(Shanghai Urban Construction Design and Research Institute(group)Co.,Ltd.,200125,Shanghai,China)
出处
《城市轨道交通研究》
北大核心
2019年第S01期91-95,共5页
Urban Mass Transit