期刊文献+

基于IR46的智能电能表升级技术研究 被引量:5

Research on upgrade technologies of smart meter based on IR46
下载PDF
导出
摘要 国际法制计量组织(International Organization of Legal Metrology,OIML)发布了IR46,要求电能表内电能计量功能与非计量功能相互独立、互不影响。电能计量功能属于法制计量部分,不允许软件升级;非计量部分的软件允许升级,但升级不能影响电能计量部分的稳定性和准确性。为满足国内下一代智能电能表在泛在电力物联网中的应用需求,研究了智能电能表非计量功能的升级技术,通过实验验证了升级技术的可行性。 The International Organization of Legal Metrology(OLML)has released the IR46,which requires that the metering function and non-metering function of electric energy are physically independent and immune to affect each other in electricity meter.The energy calculation function belongs to the legal measurement part and the software cannot be upgraded.The non-metering part of the software can be upgraded,and the upgrade should not affect the stability and accuracy of the energy metering part.In order to meet the needs of the next generation of smart meter applications in China,the upgrade technology of smart meter was studied.The tests verified the feasibility of the upgrade.
作者 巫钟兴 祝恩国 郑安刚 朱子旭 Wu Zhongxing;Zhu Enguo;Zheng Angang;Zhu Zixu(China Electric Power Research Institute Co.,Ltd.,Beijing 100192,China)
出处 《电测与仪表》 北大核心 2019年第21期136-139,共4页 Electrical Measurement & Instrumentation
基金 国家电网公司总部科技项目(JLB17201700189)
关键词 IR46 法制计量 智能电能表 升级 IR46 legal metering smart meter upgrade
  • 相关文献

参考文献7

二级参考文献39

共引文献161

同被引文献60

引证文献5

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部