摘要
针对FTTX大运维时代的传统机房能效升级改造,提出了机房分区改造方案和对应的综合布线方案。根据机房不同规模的特点设计不同的综合配线改造方案,包括匹配汇聚机房、小型接入机房及末端接入机房的多种MODF综合配线方案,对运营商存量的2G/3G传统机房升级改造具有很强的推广意义。
In view of the energy efficiency upgrading of the traditional computer room in the era of FTTx large operation and maintenance,the paper puts forward the partition transformation scheme of computer room and the corresponding comprehensive wiring scheme.According to the characteristics of different scale of the machine room,different comprehensive wiring transformation schemes are designed.Including multiple MODF integrated wiring schemes for matching aggregation room,small access room and terminal access room,it has a strong promotion significance for the upgrading and transformation of 2 G/3 G traditional computer room in the stock of operators.
作者
陈垚佳
阮盼
CHEN Yao-jia;RUAN Pan(Wuhan Polytechnic College of Software and Engineering,Wuhan 413000,China;FiberHome Telecommunication Technologies Co.,Ltd.,Wuhan 413000,China)
出处
《通信电源技术》
2019年第11期80-81,83,共3页
Telecom Power Technology
基金
2018年湖北省武汉市教育局市属高校产学研项目(CXY201807)
关键词
大运维时代
能效升级
能效分区
Opex
MODF
集束尾缆
预成端
big operation and maintenance era
energy efficiency upgrading
energy efficiency zoning
Opex
MODF
cluster tail cable
pre-formed terminal