期刊文献+

某公寓项目施工模拟探讨

Studies on Construction Simulation of An Apartment Project
下载PDF
导出
摘要 相对于施工行业来讲施工的动态管理越来越复杂,开始将三维模拟技术引用到施工管理,于是更多的功能基于原有软件上开发,软件之间的整合性也愈来愈高,再与施工顺序时间结合,更可形成所谓的4D流程即施工模拟,这样易于找出施工过程中设计与空间的矛盾冲突,发现工程工期设置的不足与缺陷所以施工模拟必将是大势所趋。 Comparing with the construction industry,dynamic construction management is becoming more and more complicated and 3 D simulation technology are gradually introduced to construction management.More relaing funcations are developed based on the original softwares,so the integration of these softwares are more intensive.The integration with construction order and time leads to the formation of the so-called 4 D process,that is,construction simulation.In this way,it is easier to find out not only the contradiction between design and space in the construction process,but also the deficiencies and defects in the construction period,so the construction simulation is becoming a general trend.
作者 钟左恒 邱森 ZHONG Zuo-heng;QIU Sen(Ningbo Vocational and Technical College)
出处 《智能建筑与智慧城市》 2019年第11期83-84,88,共3页 Intelligent Building & Smart City
关键词 建筑信息 模型技术 三维施工 模拟应用 building information model technology 3D construction simulation application
  • 相关文献

参考文献4

二级参考文献18

共引文献106

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部