近年来在变电站改建的过程中,变电一次设计受到广泛重视,但是,在实际设计的工作中经常会出现一些问题,不能确保各方面的设计工作效果,严重影响变电站长远发展.因此,在变电站的改建工作中,应积极地解决变电一次设计问题,改善设计内容和模式,全面提升整体的工作效果,为其后续的发展夯实基础.
In recent years,the primary design of substation has received extensive attention in the process of substation reconstruction.However,in the actual design work,there are often some problems,which can not ensure the design effect of all aspects and seriously affect its long-term development.Therefore,in the transformer substation reconstruction work,we should actively solve the primary design problem of transformer substation,improve the design content and mode,comprehensively enhance the overall work effect,and lay a solid foundation for its follow-up development.
出处
《电力系统装备》
2019年第18期198-199,共2页
Electric Power System Equipment
关键词
变电站改建
变电一次设计问题
应对措施
substation reconstruction
primary design of substation
Countermeasures