摘要
本文介绍了配电网装表接线施工安装过程中遇到的计量装置以及电表常见故障问题,并针对远动计量装置的计量原理进行分析,为后续的施工安装或员工培训提供技术指导,提高装表接线的施工品质,杜绝因为施工人员的个人因素,造成计量装置或单相三相电表的计量误差或电力事故发生,更切实地维护相关利益方的经济利益。
This paper introduces the measurement devices and common faults of the meter during the installation and installation process of the distribution grid.It also analyzes the measurement principle of the telemeter,and provides technical guidance for subsequent construction or staff training.Improve the construction quality of the metering wiring,and prevent the measurement error of the metering device or single-phase three-phase meter or the power accident due to the personal factors of the construction personnel,and more effectively protect the economic interests of the relevant stakeholders.