期刊文献+

WK-20大型矿用挖掘机多重化整流控制设计

Multi-Rectified Control Design of WK-20 Large Mining Shovel
下载PDF
导出
摘要 根据挖掘机的电气系统,从多重化整流理论出发,给出WK-20挖掘机整流系统设计思路;根据设备主变压器,采用12脉控制,设计基于ALM的WK-20挖掘机多重化整流方案,详细介绍两套ALM整流单元通过SINAMICS Link通讯,实现主从控制的硬件设计方案和软件实现过程。 According to the electrical system of shovel,this paper gives the design idea of the rectifier system of wk-20 shovel based on the multiple rectification theory.Depend on the main transformer of the equipment,adopting 12 pulse control technology,the wk-20 shovel multiplex rectifier scheme is designed through the use of ALM.The hardware design scheme and software realization process of two ALM rectifying units by SINAMICS Link communication are introduced in detail.This paper presents a design scheme for the application of multiple rectifying technology in large-scale equipment.
作者 张宇 Zhang Yu(Taiyuan Heavy Industry Co.,Ltd.,Taiyuan Shanxi 030024)
出处 《机械管理开发》 2019年第10期237-239,共3页 Mechanical Management and Development
基金 矿山采掘装备智能制造国家重点实验室项目(2015DQ630408)
关键词 挖掘机 多重化整流 ALM shovel multiplex rectifier ALM
  • 相关文献

参考文献2

二级参考文献5

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部