期刊文献+

配网工程施工现场临时用电的各种隐患及纠正措施探究

Probe Into Various Hidden Dangers and Corrective Measures for Temporary Power Consumption at Construction Site of Distribution Network Project
下载PDF
导出
摘要 配网工程项目建设规模不断扩大,配网工程项目施工中可能受到人为因素、作业因素、环境因素等的干扰,从而出现多种施工风险,不仅会影响施工人员的安全,还可能威胁到整个配网工程项目的经济效益。本文分析了配网工程项目中施工现场临时用电的各种隐患及纠正措施。 The construction scale of distribution network projects is expanding continuously.The construction of distribution network projects may be interfered by human factors,operational factors and environmental factors,resulting in various construction risks,which will not only affect the safety of construction workers,but also threaten them.The economic benefits of the entire distribution network project.The article analyzes the characteristics of the distribution network project,the construction risk category and source,and the construction risk management and control measures.More restore.
作者 张斯杰 Zhang Si-jie
出处 《电力系统装备》 2019年第19期216-217,共2页 Electric Power System Equipment
关键词 配网工程项目 施工风险 类别 distribution network project construction risk category
  • 相关文献

参考文献2

二级参考文献5

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部