期刊文献+

PPP项目绩效考核体系研究 被引量:2

Research on the Performance Evaluation System of PPP Projects
下载PDF
导出
摘要 近年来,随着PPP模式在我国越来越广泛地应用,健全的PPP项目绩效考核体系显得尤为重要。在介绍PPP项目绩效考核体系主要特征的基础上,基于平衡记分卡构建4个维度共16个指标的绩效考核体系模型,采用层次分析法对指标赋予权重,采用加权综合指数法对结果进行评价考核。并引入武汉市清水入江项目进行实证研究,从理论和实践层面为PPP项目绩效考核提供参考。 In recent years,as the PPP model is widely used in China,an appropriate performance evaluation system of PPP projects is particularly important.The paper first introduces the concepts and main features of the performance evaluation system related to PPP projects,and then builds a performance evaluation system with 16 indicators in four dimensions based on the balanced scorecard.The analytic hierarchy process method is used to assign weights to the identified indicators,and the results are weighted by the comprehensive index method.Finally,the Wuhan Qingshui River Project was introduced for empirical research.It provides reference for PPP project performance evaluation from the theoretical and practical levels.
作者 穆智琼 郑磊 程言美 MU Zhi-qiong;ZHENG Lei;CHENG Yan-mei(School of Civil Engineering,Southeast University,Nanjing 210096,China;School of Civil Engineering and Architecture,Wuhan University of Technology,Wuhan 430070,China)
出处 《工程管理学报》 2019年第5期57-61,共5页 Journal of Engineering Management
基金 住房和城乡建设部课题(2018)13号.
关键词 PPP模式 绩效考核 平衡记分卡 PPP model performance assessment balanced score card
  • 相关文献

参考文献9

二级参考文献48

  • 1赵国富,王守清.城市基础设施BOT/PPP项目社会评价方法研究[J].建筑经济,2006,27(S2):113-116. 被引量:23
  • 2王振,刘茂.应用区间层次分析法(IAHP)研究高层建筑火灾安全因素[J].安全与环境学报,2006,6(1):12-15. 被引量:65
  • 3孟宪海.关键绩效指标KPI——国际最新的工程项目绩效评价体系[J].建筑经济,2007(2):50-52. 被引量:37
  • 4YUAN J F, ZENG J Y, MIROSLAW J S, LI Q M. Selection of performance objectives and key performance indicators in public private partnership projects to achieve value for money [ J ]. Construction Management and Economics, 2009, 27 ( 3 ) : 253 - 270.
  • 5国务院.《国务院关于鼓励和引导民间投资健康发展的若干意见》(国发[2010]13号)[EB/OL].[2010-05-13].http-//www.gov.cn/zwgk/2010-05/13/con-tent_1605218.htm.
  • 6LIN G, SHEN Q. Measuring the performance of value Man- agement studies in construction: Critical review [ J ]. Journal of Management in Engineering, 2007, 23 ( 1 ) : 2 - 9.
  • 7KPI Working Group. KPI Rep. for the Minister for Construc- tion[ R]. Dept. of the Environment, Transport and the Re- gions. London, 2000.
  • 8ATKINSON A A, WATERHOUSE J H, WELLS R B. A stakeholder approach to strategic performance measurement [J]. Sloan Management Review, 1997, 38 (3) : 25 -37.
  • 9WATERIDGE J. How can IS/IT projects be measured for success [ J ]. International Journal of Project Management, 1998, 16 (1): 59-63.
  • 10KAGIOGLOU M, COOPER R, AOUAD G. Performance management in construction: A conceptual framework [J]. Construction Management and Economics, 2001, 19 (1): 85 - 95.

共引文献2321

同被引文献9

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部