摘要
介绍了以天然气为原料的合成氨装置工艺气余热回收系统两台核心设备存在的问题,分析了高压废热锅炉及高压蒸汽预热器更新改造的原因,论述了改造路线的选择、遇到的难点及其解决措施,并评估了改造效果及经济性。
The problems existing in two core equipments of the waste heat recovery system of process gas in the ammonia plant using natural gas as feedstock were introduced. The reasons for the renovation of high-pressure waste heat boiler and high-pressure steam preheater were analyzed, and the selection of transformation route, the difficulties encountered and the measures to solve them were discussed. The transformation effect and economy were also evaluated.
作者
陈凤壮
CHEN Feng-zhuang(China BlueChemical Ltd.,Dongfang 572600,China)
出处
《天然气化工—C1化学与化工》
CAS
CSCD
北大核心
2019年第5期102-106,共5页
Natural Gas Chemical Industry
关键词
合成氨装置
余热回收
废热锅炉
蒸汽预热器
ammonia plant
waste heat recovery
waste heat boiler
steam preheater