摘要 为了解决断层破碎带大断面巷道围岩控制的难题,结合长平矿4320回风措施巷的围岩地质条件,分析了断层破碎带巷道围岩破碎机理,提出了超前注浆加固+锚杆索支护+工字钢补强的围岩控制方案。试验表明,超前注浆加固可以改善围岩力学性能,提高围岩刚度和强度;及时进行锚杆索加密支护和工字梁加固的主被动支护可有效控制巷道的有害变形。 In order to solve the problem of surrounding rock control of large-section roadway in fault fracture zone,combined with the surrounding rock geological conditions of Changping Mine 4320 air return roadway, the surrounding rock fracture mechanism of fault fracture zone roadway was analyzed, and advanced grouting reinforcement + anchor was proposed, cable support + I-beam reinforcement of the surrounding rock control program. The test showed that the advanced grouting reinforcement could improve the mechanical properties of the surrounding rock and improve the stiffness and strength of the surrounding rock. The active and passive support of the bolt and cable reinforcement support and the I-beam reinforcement could effectively control the harmful deformation of the roadway.
作者 宋文侠 Song Wenxia(Shanxi Changp ing Mining Industry Corporation Ltd.,Jincheng 048000,China)
出处 《煤炭与化工》 CAS 2019年第10期21-24,28,共5页 Coal and Chemical Industry
关键词 断层破碎带 大断面 超前注浆 锚杆支护 工字梁加固 fault fracture zone large section advanced grouting bolt support I-beam reinforcement
  • 相关文献

参考文献6

二级参考文献48

共引文献79

同被引文献33

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部