摘要 根据立井钢结构套架的结构特点、现场施工条件及施工工期等要求,提出了四种立井钢结构套架的施工方案。对施工方案进行技术分析及方案比较,介绍了立井钢结构套架施工方案的适用范围,为安全、优质、经济、高效地进行立井套架安装施工提供了理论依据和技术保障。 According to the structural characteristics, site construction conditions and construction period of shaft steel frame, four schemes are put forward, technical analysis and comparison of construction schemes are made, and their applicable scope is introduced, which provides the theoretical basis and technical guarantee for the safe, high-quality, economical and efficient installation and construction of shaft steel frame.
作者 叶大干 Ye Da-gan(Mechanical and Electrical Installation Project Co.,Ltd.,China Coal Third Construction Group,Anhui Suzhou 234001)
出处 《山东煤炭科技》 2019年第11期138-140,共3页 Shandong Coal Science and Technology
关键词 煤矿立井套架 施工方案 技术分析 coal mine shaft frame construction scheme technical analysis
  • 相关文献

参考文献2

二级参考文献5

  • 1吴洪生,莫振声.(初、中、高)级起重工工艺学[M].北京:机械工业出版社,1989.
  • 2GB50205-2001.钢结构工程施工质量验收规范[S].[S].,..
  • 3MT5010-95.煤矿安装工程质量评定标准[S].[S].,..
  • 4罗顶瑞;朱兆华.大型吊装组织设计与方案实例分析[M]北京:化学工业出版社,2008.
  • 5朱兆华;罗顶瑞.起重工安全技术[M]北京:化学工业出版社,2000.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部