混合-组合梁斜拉桥施工期材料参数误差分析

Influence of Material Parameters Error of Cable-stayed Bridge with Hybrid-composite Girder During Construction Period
下载PDF
导出
摘要 斜拉桥施工过程中,由于施工工艺复杂、施工周期较长,材料参数误差不可避免。为明确材料参数误差对施工过程的影响,以澜沧江斜拉桥为依托工程,选取主塔刚度、桥面板自重和主梁弹性模量等材料参数误差为变量,通过有限元分析,研究其对主梁线形、桥面板应力和斜拉索索力的影响。研究结果表明:主塔刚度、桥面板自重对主梁线形的影响较为显著;桥面板自重对桥面板应力的影响较大;主塔刚度对斜拉索索力的影响明显大于主梁弹性模量等参数。因此,施工控制过程中,应将主塔刚度和桥面板自重作为施工控制的重点。 The cable-stayed bridge s material parameter error is unavoidable due to complex construction technology and long construction period in the construction process.To clarify the sensitivity of material parameter errors,select the parameters of steel girder s dead weight,cable and main tower s elastic modulus based on the Lancang River Bridge to study the influence of the errors on the alignment of main girder,stress of bridge deck and cable force by finite element analysis.The results show that the main tower s stiffness and the deck s volume weight have significant effects on the alignment of the main girder.The weight of deck has a great influence on its stress,and the main tower s stiffness has a larger influence on the cable force than the steel main girder s elastic modulus and other parameters.Therefore,the main tower stiffness and the bridge deck s volume weight should be taken as the key points in the process of construction control.
作者 余永亮 郑留帮 金嘉福 杨子先 王贤强 YU Yongliang;ZHENG Liubang;JIN Jiafu;YANG Zixian;WANG Xianqiang(Construction Headquarters of Lancang River Bridge,Jinghong 666100,China;Civil Engineering,Nanjing Tech University,Nanjing 211800,China;JSTI Group Co.,Ltd.,Nanjing 211112,China)
出处 《现代交通技术》 2019年第5期55-58,共4页 Modern Transportation Technology
基金 云南省交通运输厅科技项目(2017-26) 江苏省博士后科研资助计划项目(2018K136C)
关键词 混合组合梁 有限元分析 施工期 材料参数 误差影响 hybrid-composite girder finite element analysis construction period material parameters error influence
  • 相关文献

参考文献4

二级参考文献25

  • 1陈德伟,郑信光,项海帆.混凝土斜拉桥的施工控制[J].土木工程学报,1993,26(1):1-11. 被引量:67
  • 2梁鹏,肖汝诚,徐岳.超大跨度斜拉桥的安装构形与无应力构形[J].长安大学学报(自然科学版),2006,26(4):49-53. 被引量:44
  • 3Virlogeux M. Recent evolution of cable-stayed bridges [ J ]. Engineering Structures, 1999, 21 : 737-755.
  • 4Fujisawa N, Tomo H. Computer-aided cable adjustment of stayed bridges [ C ]//IABSE. 1985 : 181-190.
  • 5Breen J E. Controlling twist in precast segment concrete bridge[J]. PCI Journal, 1985, 4.
  • 6Furukawa K, Inoue K, Nakayama H, et al. Studies of the management of cable-stayed bridges under construction using multiobjective programming method [ C ]//Proceedings of Japanese Society of Civil Engineering. Japan : 1986 : 1-6.
  • 7Sakai F, et al. Construction control system for cable-stayed bridges[C]//Proe. IABSE. 1988, 92(85) : 147-152.
  • 8Sakai F, et al. Application of construction control system to erection of stiffening truss girder of Rainbow Bridge [ C ]// Proc. Inter. Conf. Bridge into 21 Century. Hong Kong: 1994 : 459-466.
  • 9Seki F, Tanaka S. Construction control system for cablestayed bridge [ C ]// Proceeding of IABSE. 1988, 92 (85) : 181-190.
  • 10Manabe Y, Hirahara N, Mukasa N, et al. Accuracy control on the construction of Tatara Bridge [ C ]//IABSE Conference. Malmo: 1999.