摘要
本文介绍了在地质条件恶劣的海新三号隧道工程中采用超前管棚支护技术施工方案,有效避免因围岩浅埋偏压、岩体结构破碎段的坍塌事故,保障了施工安全,论证了该施工方案在实际运用中的价值。
This paper introduces the construction scheme of the advanced pipe shed support technology in the Haixin No.3 tunnel project with poor geological conditions,effectively avoiding the collapse accident caused by the shallow buried bias of the surrounding rock and the broken section of the rock mass structure,and ensuring the construction safety.It demonstrates the value of the construction plan in practical use.
作者
胡兴成
Xingcheng Hu(China Railway 18th Bureau Group First Engineering Co.,Ltd.,Zhuozhou 072750,China)
出处
《青海交通科技》
2019年第5期111-114,共4页
Qinghai Transportation Science and Technology
关键词
超前管棚支护
施工技术
海新三号隧道
advance pipe roof
construction technology
Haixin No.3 Tunnel