摘要
以某地万达广场的临时用电施工作为案例,根据施工现场的需要对临时用电的布置、线路敷设、电气装置选择、临时照明设备等进行设计制订相应的临时用电方案,最后结合施工现场情况编制避雷装置和接地装置等施工方案。望可为类似工程提供借鉴。
Taking the construction of temporary electricity in Wanda Square as a case,according to the needs of the construction site,the layout of temporary electricity,line laying,selection of electrical equipment,temporary lighting equipment,etc.,the corresponding temporary power utilization scheme shall be designed and finally prepared according to the construction site conditions,such as lightning protection device and grounding device. Hoping to provide reference for similar projects.
出处
《建筑技术开发》
2019年第21期58-59,共2页
Building Technology Development
关键词
施工现场
临时用电
开关箱
construction site
temporary electricity
switch box