摘要
通过对某综合楼的悬挑防护棚的搭设形式、材料要求,结合防护棚的受力计算,最终根据计算结果制订相应的搭设施工方案,为防护棚达到安全施工的目的。
Through the setting form and material requirements of the overhanging protective shed of a comprehensive building,combined with the force calculation of the protective shed,the corresponding construction scheme is finally worked out according to the calculation results,so as to achieve the purpose of safe construction of the protective shed.
出处
《建筑技术开发》
2019年第21期74-75,共2页
Building Technology Development
关键词
悬挑防护棚
施工
搭设
overhanging protective shed
construction
setting up