摘要 针对景洪水电站溢流表孔与消力池存在的空蚀破坏问题,从水力学原理与施工工艺等方面综合分析缺陷原因,采用针对性的修复技术与材料对缺陷部位进行修复,并详细介绍了修复方案,对类似缺陷修复工程具有参考意义。 The cavitation damage of the surface outlets and stilling pool of Jinghong Power Plant is comprehensively analyzed from the aspects of hydraulic principles and construction technology. The defect repairing technology and materials are used to repair the defect parts. The scheme has reference significance for similar defect repair projects.
作者 张浩江 孙建英 蒋金磊 杨念东 ZHANG Hao-jiang;SUN Jian-ying;JIANG Jin-lei;YANG Nian-dong(Jinghong Hydropower Station,Huaneng Langcang River Hydropower Inc)
出处 《大坝与安全》 2019年第4期49-52,共4页 Dam & Safety
关键词 景洪电厂 溢流表孔 消力池 缺陷修复 Jinghong hydropower station surface outlet stilling basin defect repairs
  • 相关文献

参考文献9

二级参考文献32

  • 1周延阳,姚谏.混凝土表层嵌贴FRP粘结机理研究进展[J].科技通报,2006,22(2):221-230. 被引量:16
  • 2卢路生,刘惠锋.某工程穿坝廊道混凝土缺陷处理方案[J].人民长江,2006,37(6):21-22. 被引量:3
  • 3卜良桃,毛晶晶.新老混凝土补强加固界面粘结质量检验研究展望[J].四川建筑科学研究,2006,32(3):64-66. 被引量:6
  • 4环氧树脂砂浆技术规程,DL/T5193-2004[S].
  • 5DL/T5144-2001.水工混凝土施工规范[S].[S].,..
  • 6周厚德,李焰.DL/T5148-2012,水工建筑物化学灌浆施工规范[S].
  • 7周立霞,王昱之,王起才.混凝土界面黏结材料的宏观试验研究[J].兰州交通大学学报:自然科学版,2004,23(1):43-45.
  • 8Eduardo N B S, Femando A B, Branco V D. Concrete-to-concrete bond strength:influence of the roughness of the substrate surface [ J ]. Construction and Building Materials,2004,18 ( 9 ) : 675 - 681.
  • 9Li G Y. A new way to increase the long-term bond strength of new-to-old concrete by the use of fly ash [ J ]. Cement and Con- crete Research, 2003,33 (6) :799 - 806.
  • 10Ariel D E ,Javier L. Estimation of bond strength envelops for old- to-new conerete interfaces based on a cylinder splitting test [ J ]. Construction and Building Materials,2011,25 : 1222 - 1235.