摘要
蒸氨废水冷却过程中,循环水通道与废水通道易结垢堵塞,导致换热效率逐渐降低。经过研究与探索,采用蒸氨废水循环预冷,并设置软水换热器的方式,解决了冷却器易结垢堵塞的难题。
During the process of stripped water cooling,the circulating water line and waste water line would be prone to blockage due to scaling,which would decrease heat exchanging efficiency.It is studied that pre-cooling circulation for the stripped water plus soft water heat exchanger can solve this problem.
作者
文小波
汪业民
黄力
梁周祥
Wen Xiaobo;Wang Yemin;Huang Li;Liang Zhouxiang(Hunan Coal-Chemical New Energy Co.,Ltd.,Loudi 417009,China)
出处
《燃料与化工》
2019年第6期42-43,45,共3页
Fuel & Chemical Processes
关键词
蒸氨废水
冷却器
循环预冷
软水换热
Stripped water
Cooler
Circulation for pre-cooling
Soft water heat exchanger