期刊文献+

基于三维程式的海底通道地铁项目施工风险识别 被引量:2

Construction Risk Identification of Cross-sea Channel Subway Project Based on 3D Program
下载PDF
导出
摘要 以盾构法整个掘进过程为对象,根据盾构法施工阶段的工艺步骤,结合以往经验及研究成果,运用盾构法施工风险识别的三维程式方法确定风险识别的范围和对象。通过WBS工作分解结构树和RBS风险分解结构树耦合,梳理盾构法施工基本工序单元与风险因素的对应关系,构建盾构法施工风险因素识别WBS-RBS结构矩阵,并据此建立过海通道盾构法施工风险因素矩阵,识别出过海通道盾构法施工关键风险因素。以期对过海通道盾构法项目施工风险管理提供理论依据和风险识别工具,为其他类似工程施工风险识别提供参考。 This paper takes the whole excavation process from the beginning of the shield method as the object.According to the process steps of the shield construction stage,combined with the previous experience and research results,the three-dimensional program method of shield construction risk identification is used to determine the scope and the objects of risk identification.Through the coupling of WBS work breakdown structure tree and RBS risk decomposition structure tree,the corresponding relationship between the basic process unit and risk factors of shield construction is combed,and the WBS-RBS structure matrix of shield construction risk factor identification is constructed.The risk factor matrix of the sea channel shield construction method identifies the key risk factors for the construction of the cross-sea channel shield method.In order to provides theoretical basis and risk identification tools for construction risk management of the cross-sea channel shield method project,and provides reference for other similar project construction risk identification.
作者 李顺平 周红 舒婷 LI Shunping;ZHOU Hong;SHU Ting(China Railway South Investment Group Co.,Ltd,Shenzhen 518054,China;Xiamen University,Xiamen 361005,China)
出处 《建筑经济》 北大核心 2019年第12期36-40,共5页 Construction Economy
基金 中铁建投2016年科技重大计划:基于BIM的厦门地铁三号线过海通道施工风险集成控制与系统研发(201601-1)
关键词 施工风险识别 三维程式 工作分解结构 风险分解结构 construction risk identification three-dimensional program work breakdown structure risk breakdown structure