330 MW燃煤锅炉污泥掺烧结构参数优化分析

Study on Optimization of Structure Parameters of 330 MW Coal Fired Boiler Sludge Blending
下载PDF
导出
摘要 针对目前燃煤锅炉污泥掺烧设备运行中故障较多且不能达到设计出力问题,从运行设备配合、后期辅助设备添加等方面制定具体实施措施并对实施后效果进行对比分析。通过分析发现,增加高温烟气除尘设施、输送风量,适当调整出口烟温、料温,均可达到提高掺烧设备出力和稳定性的目的。 Aiming at the problems of many faults in the operation of the sludge mixed buring equipment of the coal-fired boiler and the failure to reach the designed output,specific implementation measures are formulated from the aspects of operation equipment coordination and the addition of auxiliary equipment in the later stage,and the effect after implementation is compared and analyzed.It is found that the output and stability of the mixed burning equipment can be improved by adding the high temperature flue gas dust removal facilities and conveying air volume,and adjusting the outlet smoke temperature and material temperature appropriately.
作者 刘晓冰 LIU Xiaobing(Huadian Weifang Power Generation Co.,Ltd.,Weifang 261000,China)
出处 《山东电力技术》 2019年第11期73-75,80,共4页 Shandong Electric Power
关键词 污泥掺烧 初始缺陷 参数优化 sludge mixed burning initial defect parameter optimization
  • 相关文献

参考文献5

二级参考文献14

共引文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部