在市政工程污水管道顶管施工过程中,遇到流沙层,并由于设备损坏维修后,发生抱管现象,致使顶管施工在中途无法继续顶进。经综合对比分析,采用"反顶+钢套管"的方法取出机头的同时并完成剩余管道的顶进工作。
In municipal engineering sewage pipe jacking construction process, encountered quicksand layer, and because of equipment damage maintenance, the occurrence of pipe holding phenomenon, resulting in the construction of pipe jacking in the middle can not continue to jacking. After comprehensive comparison and analysis, the method of "reverse jacking+steel casing" is adopted to take out the machine head and complete the jacking of the remaining pipelines.
作者
金克
朱宝成
郭滨
JIN Ke;ZHU Bao-cheng;GUO Bin(CSCEC International Engineering Co.Ltd.,Shenzhen 518000,China)
出处
《工程建设与设计》
2019年第22期200-201,共2页
Construction & Design for Engineering
关键词
市政工程
顶管
钢套管
municipal engineering
jacking pipe
steel sleeve