期刊文献+

高频振动对工业数码电子雷管延期时间的影响 被引量:3

Influence of Delay Time of High Frequency Vibration on Industrial Digital Electronic Detonator
下载PDF
导出
摘要 为了评定高频振动对工业数码电子雷管延期时间的影响,模拟电子雷管在运输和使用过程中可能经受的高频振动环境,对某型电子雷管的延期时间进行了试验分析。结果表明,经过振动试验后,延期时间明显提高。根据《火工品试验方法第32部分:高频振动试验》中表1和表2试验条件进行振动试验后,对延期时间的影响无差异。 In order to evaluate the influence of high frequency vibration on the delay time of industrial digital electronic detonator,the delay time of a certain type of electronic detonator was tested and analyzed by simulating the high frequency vibration environment that the electronic detonator might experience during transportation and use. The results show that the delay time increases obviously after vibration test. According to the test conditions in table 1 and table 2 of " methods of fire test-part 32: high frequency vibration test",there is no difference in the effect of vibration test on delay time.
作者 岳彩新 秦婷 高玉刚 孙晨 王婷婷 YUE Caixin;QIN Ting;GAO Yugang;SUN Chen;WANG Tingting(College of Chemical Engineering,Anhui University of Science and Technology,Huainan 235000,China;Anhui Longbo Electric Co.,Ltd.,Huaibei 235000,China)
出处 《煤矿爆破》 2019年第4期8-12,共5页 Coal Mine Blasting
关键词 工业数码电子雷管 高频振动试验 延期时间 电引火元件 装药密度 industrial digital electronic detonators high frequency vibration test delay time electric ignition element charge density
  • 相关文献

参考文献5

二级参考文献20

共引文献30

同被引文献26

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部