摘要
本文在全国大范围开展城镇污水处理厂提标改造的背景下,讨论了提标改造实施的科学性、项目实施方式和设计方案选取,提出提标改造工程设计、建设前应开展现状评估,分析阐述了提标改造建设施工可能面临的困难和提标改造后的运行挑战等,以供同行参考。
Under the background of large-scale upgrading for higher technical standard of urban sewage treatment plant in China,the scientific nature of the upgrading,project implementation mode and design scheme selection are discussed.This paper puts forward that the current situation evaluation should be carried out before the design and construction of upgrading project,expounds the possible difficulties in the construction of the upgrading project and the operation challenges after the upgrading for peer reference.
作者
蔡慧野
陈爱朝
严国奇
陈维航
陈一婧
梁胜娜
Cai Huiye;Chen Aichao;Yan Guoqi;Chen Weihang;Chen Yijing;Liang Shengna(Hangzhou Water Group Co.,Ltd.,Hangzhou,310009,Zhenjiang)
出处
《建设科技》
2019年第23期15-19,共5页
Construction Science and Technology
关键词
标准
提标改造
评估
项目实施
standard
upgrading for higher technical standard
assessment
project implementation