文章以某火力发电企业实际树脂更换工作为例,从新旧树脂更换的原则、方案设计、新树脂装填量的核算等方面,对凝结水精处理的树脂更换工作中应注意的问题进行探讨和总结。
Taking the actual resin replacement work ina thermal power generation enterprise as an example,some problems that should be paid attention to in the resin replacement work of condensed water finishing werediscussed and summarized from the aspects of the principle of new and old resin replacement,scheme design,and calculation of new resin loading.