摘要
"十三五"期间,我国风电开发逐渐移向中东部及南方地区,南方地区山地较多,地形复杂,风速低,植被茂密,风电开发区域大多属于林地范围。结合多年山地风电工程项目的施工经验,笔者总结了山地风电施工难点和关键技术,以期为山地风力发电场土建施工提供借鉴指导。
During the "Thirteenth Five-Year Plan" period, China’s wind power development gradually moved to the central and eastern regions and the southern region. There are more mountains in the south, the terrain is complex,the wind speed is low, and the vegetation is dense, most of the wind power development areas belong to the forest land area. Combining the construction experience of many years of mountain wind power projects, the author summarized the difficulties and key technologies of mountain wind power construction, in order to provide reference for the civil construction of mountain wind farms.
作者
任杰
曾庆贺
REN Jie;ZENG Qinghe(Sinohydro Bureau 8 Co.,Ltd.,Changsha Hunan 410004)
出处
《河南科技》
2019年第29期57-59,共3页
Henan Science and Technology
关键词
山地风电
难点
技术
土建施工
mountain wind power
difficulties
technology
civil construction