摘要
天城坝隧道进口左线近距离揭煤层群,含煤9~13层,自上而下编号为C5、C6、C7(含C7-1、C7-2、C7-3)、C8(含C8-1a、C8-1b、C8-2)、C11和C12。该段含煤地层段为突出煤层,为确保瓦斯抽采治理效果,分多轮次对煤层群进行瓦斯抽采治理。由于各煤层层间距较近,确保安全垂距的前提下,根据隧道大断面开挖特点,制定了多台阶开挖方式并确保了安全垂距。实践证明,多台阶开挖方式是安全可靠的。
Tianchengba tunnel entrance on the left line of the coal seam group,coal-bearing layers 9~13 are num?bered C5、C6、C7(including C7-1、C7-2、C7-3)、C8(includingC8-1a、C8-1b、C8-2)、C11 and C12 from top to bottom.The coal-bear?ing strata in this section are outburst coal seams.In order to ensure the effect of gas drainage,the coal seams were treated by gas drainage in several rounds.Due to the close distance between each coal seam and the premise of ensur?ing safe vertical distance,according to the characteristics of large cross-section tunnel excavation,the multi-step ex?cavation was made and the safety vertical distance is ensured.The excavation method is safe and reliable.
作者
于海平
陈兴燚
陈毅
欧显文
YU Haiping;CHEN Xingyi;CHEN Yi;OU Xianwen(Civil Engineering Co.,Ltd.,China Construction Fourth Engineering Dixision Corp.Ltd.,Xiamen Fujian 361010;Chongqing Energy Investment Group Technology Co.,Ltd.,Chongqing 400060)
出处
《河南科技》
2019年第31期74-75,共2页
Henan Science and Technology
关键词
近距离煤层群
开挖方式
安全垂距
瓦斯治理
close-distance coal seam group
excavation method
safety vertical distance
gas control