摘要
428XL系统常用的数字采集链有三分量和单分量两种,三分量站与单分量站都有垂直方向分量.三分量采集站在使用时同时接收三个方向分量数据.在某高密度勘探项目生产过程中,因DSU1链数量不足,使用了部分DSU3链用作DSU1链.本文介绍了将DSU3链用作DSU1链的方法及注意事项.
428XL system common digital link includes two sorts:three-component and one-component.Both the three-component unit and one-component unit have vertical components.When the three-component acquisition unit is used,it receives the data of three directional components at the same time.In the high density exploration project of Jiangsu area,DSU3 links are used as DSU1 links because of the insufficient number of DSU3 links.This article introduces the method and matters when DSU3 links are used as dsul links.
出处
《物探装备》
2019年第4期245-247,共3页
Equipment for Geophysical Prospecting