宁河区厂外供水管线设计探讨

Discussion on plant-out water supply pipeline design in Ninghe district
下载PDF
导出
摘要 天津市宁河区厂外供水管线是基于对新建地表水给水厂净水的输送而进行的工程设计,其供水的终点是其他各已建地下水给水厂的清水池。通过对不同设计路线的比选和优缺点的分析、描述相关管线附件的设计原则和已建管线交叉避让问题的处理方式,来把握供水管线的设计合理性和优化性。同时,通过对沿程和局部水头损失的计算,分析得出最不利控制点的位置及对策措施。 Plant-out water supply pipeline design in Ninghe district of Tianjin is based on treated drinking water transportation of newly built surface water treatment plant with the end points are the reservoirs of other built ground water treatment plants.This paper uses the method of comparison and analysis of pros and cons on different pipeline design routes,describes the design principle of relating pipeline accessories and the solving ways on pipeline crossing problem to control the reasonableness and optimization on water supply pipeline design.In the meantime,the calculation of frictional and local head loss can find the worst user point and present the relevant strategies.
作者 袁晓宇 刘晓天 刘天顺 Yuan Xiaoyu;Liu Xiaotian;Liu Tianshun(Tianjin Municipal Engineering Design and Research Institute,Tianjin 300051,China)
出处 《山西建筑》 2019年第22期95-96,共2页 Shanxi Architecture
关键词 桥北地区 蓟运河 设计路线 水头损失 area on north of bridge Jiyun river design route hydraulic loss
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部