Stability Analysis of Cross-Channel Excavation for Existing Anchor Removal Project in Subway Construction 被引量:1

下载PDF
导出
摘要 The cutter head will be stuck when the shield machine pass through the area existing anchor left by foundation construction of surrounding high-rise building.Subsurface excavation method is an efficient way to remove the existed anchor.In this paper,a three-dimensional finite element model is developed to study stability of cross-channel excavation.The time-spatial effects of arch crown settlement,intrados uplift and side wall horizontal convergence are analyzed according to different excavation size,lining thickness and lining order.The results show that the excavation size is the main factor to control the deformation of the surrounding soil,especially in arch crown settlement;The influence of lining thickness on the spatial effect of surrounding soil deformation is obvious when the excavation size is large,but little on the time effect;The influence of the lining order on the deformation of the surrounding soil is obvious,in particular,the larger the excavation size,the more obvious advantages of the lining order.Finally,based on the time-spatial effects comparison of nine excavation schemes of the cross-channel,an optimum excavation scheme is adopted in the actual project.
出处 《Computer Modeling in Engineering & Sciences》 SCIE EI 2017年第1期57-69,共13页 工程与科学中的计算机建模(英文)
基金 The National Natural Science Foundation of China(No.41404096,51678536,51509224) The Scientific and Technological Research Program of Henan Province(No.152102310066) Outstanding Young Talent Research Fund of Zhengzhou University(1621323001)for which the authors are grateful.
  • 相关文献

参考文献3

二级参考文献31

共引文献87

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部