期刊文献+

Longitudinal Vibration Analysis of Marine Riser During Installation and Hangoff in Ultra Deepwater 被引量:1

下载PDF
导出
摘要 This paper is concerned with the problem of longitudinal vibration of a 3,000 m long disconnected drilling riser during installation and hangoff operation.The natural frequency,amplitude of vibration displacement and vibration force of longitudinal vibration have been determined with consideration of the damping effect of the sea water.Results show the natural frequency of riser under these two situations are both decrease with the increase of water depth.The natural frequency of riser in installation operation is bigger than that in hangoff operation.The vibration displacement in hangoff configuration is bigger than that in installation while the vibration force in hangoff configuration is smaller than that in installation configuration.Under the condition of resonance,the vibration displacement increase along riser from top end to the bottom end while the vibration force increase along riser from riser bottom end to the top end.
出处 《Computer Modeling in Engineering & Sciences》 SCIE EI 2016年第4期357-373,共17页 工程与科学中的计算机建模(英文)
基金 The authors gratefully acknowledge the financial support from the Natural Science Foundation of China(NSFC,51221003,U1262201) This research is also supported by other projects(Grant numbers:2013AA064803,2011ZX05009-005).
  • 相关文献

参考文献2

二级参考文献5

  • 1Brekke J N, Soles J, Wishahy M A, et al. Drilling riser management for a DP drillship in large, rapidly - developing seastates in deepwater[C]//Proceedings of the 2004 SPE/IADC Drilling Conference, Dallas, USA, 2004.
  • 2Ambrose B D, Grealish F, Whooley K. Soft hangoff method for drilling risers in ultra deepwater[C]//Proceedings of the 2001 Offshore Technology Conference, Houston, USA, 2001.
  • 3Ambrose B D, Childs M S, Leppard S A, et al. Application of a deepwater riser risk analysis to drilling operations and riser design[C]//Proceedings of the 2001 Offshore Technology Conference, Houston, USA, 2001.
  • 4Steddum R. The management of long, suspended strings of tubulars from floating drilling vessels[C]//Proceedings of the 2003 Offshore Technology Conference, Houston, USA, 2003.
  • 5Brekke J N. Key elements in ultra-deep water drilling riser management[C]//Proceedings of the 2001 SPE/IADC Drilling Conference, Amsterdam, The Netherlands, 2001.

共引文献26

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部