在大型水电站施工管理中,可将全部专业工程或劳务作业分包给有能力的承包人,利用承包人的专业优势完成项目建设与管理。在严格遵循国家标准要求和劳务合同下,明确各方权限职责,并主动建立起完善的施工管理制度体系,使安全、成本、进度、质量等各项施工管理工作规范化,从而确保水电站工程得以保质保量地建设,真正达到项目经济效益与社会效益最大化的目标。
In the construction management of large-scale hydropower station,all professional or labor work can be subcontracted to competent contractors and the project construction and management can be completed with the contractor’s professional advantages.In this case,the responsibilities of all parties should be clarified firstly in strict accordance with the requirements of national standards and labor contracts.Then,a comprehensive construction management system should be established initiatively to standardize the management of safety,cost,progress and quality.Thus,the construction quality and quantity of the hydropower project are ensured and the maximum economic and social benefits can be achieved.
作者
邓文明
刘朝建
潘伟
DENG Wenming;LIU Chaojian;PAN Wei(Xizang Construction Engineering Co.,Ltd.,Sinohydro Bureau 9 Co.,Ltd.,Lhasa 850000,China)
出处
《水电与新能源》
2019年第12期56-59,共4页
Hydropower and New Energy
关键词
全劳务分包
大型水电站
施工管理
full labor subcontracting
large-scale hydropower station
construction management