在深圳抽水蓄能电站安全监测设计和施工过程中,笔者主要对其中的地下渗流场监测设计和施工、滑动测微计的安装和观测、土石坝水平位移监测方案这3个问题进行了总结和探讨,并提出见解,以供同行参考。
In the process of safety monitoring design and construction of Shenzhen Pumped Storage Power Station,the authors mainly summarize and discuss three problems of monitoring design and construction of underground seepage field,installation and observation of sliding micrometer,and monitoring scheme of horizontal displacement of earth-rockfill dam,and put forward some opinions for peers reference.
作者
张彬
高平
ZHANG Bin;GAO Ping(Guangdong Hydropower Planning&Design Institute,Guangzhou,Guangdong,510170)
出处
《红水河》
2019年第6期5-8,共4页
Hongshui River
关键词
抽水蓄能电站
安全监测
渗流
监测
设计和施工
pumped storage power station
safety monitoring
seepage flow
monitoring
design and construction