建筑师负责下EPC工程项目管理三控制 被引量:9

The three control of EPC project management under the architect responsibility system
下载PDF
导出
摘要 建筑师负责制下的EPC总承包模式强调了建筑师在工程项目中的主导地位及设计的牵头作用,能够更宏观地把控项目管理三控制的对立统一关系,从而有效提高工程质量,加快工程进度,降低工程成本,实现建筑工程项目的社会价值。 The EPC general contracting model under the Architect Responsibility System emphasizes the architect s dominant position in the engineering project and the leading role of the design.It can more effectively control the unity of the three control of project management,thus effectively improving the quality of the project,speeding up the project progress and reduce engineering costs,therefore realizing the social value of construction projects.
作者 黄冬昀 王春建 丁浩南 HUANG Dongyun;WANG Chunjian;DING Haonan(School of Tourism and Urban Planning,Chengdu University of Technology,Chengdu 610059,China))
出处 《四川建材》 2019年第12期198-200,共3页 Sichuan Building Materials
关键词 建筑师负责制 EPC模式 质量控制 进度控制 成本控制 the architect responsibilit system the EPC general contracting model quality control progress control cost control
  • 相关文献

二级参考文献7

共引文献75

同被引文献22

引证文献9

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部