摘要
在前期勘察阶段查明老滑坡是否复活是有一定难度的,治理施工过程中有必要采取施工勘察和变形监测进一步查明老滑坡的稳定状态,为滑坡治理方案设计优化提供依据。以东岳庙2号老滑坡治理工程为实例,介绍施工勘察、变形监测和设计优化的全过程,体会到施工勘察和变形监测对设计优化的重要性。
It is difficult to find out whether the old landslide revives in the early stage of investigation. In order to find out the stable state of the old landslide, it is necessary to take construction survey and deformation monitoring in the process of treatment and construction, so as to provide basis for the design and optimization of the landslide treatment scheme. Taking Dongyuemiao No.2 old landslide control project as an example, the whole process of construction survey, deformation monitoring and design optimization is introduced, and the importance of construction survey and deformation monitoring to design optimization is realized.