摘要
通过对施工现场的质量检查、图纸审核,认为深锥沉降洗涤槽设计、施工都存在一些问题。针对沉降洗涤槽的施工质量和设计问题进行调查研究,最终促成了总承包对101号~107号沉降洗涤槽进行系统性的整改、补强。
Through the quality inspection and drawing review of the construction site,it is considered that there are some problems in the design and construction of the deep cone settlement sink.Based on the investigation and Research on the construction quality and design problems of the settlement washing tank,the general contractor finally carried out systematic rectification and reinforcement on the settlement washing tank 101~107.
作者
黄伟
HUANG Wei(Zunyi Aluminum Co.,Ltd.,Zunyi 563100,China)
出处
《世界有色金属》
2019年第18期281-281,283,共2页
World Nonferrous Metals
关键词
沉降槽
施工
设计
settlement tank
construction
design