期刊文献+

铜矿尾矿库生态修复技术实践 被引量:1

Practice of ecological restoration technology for copper mine tailings pond
下载PDF
导出
摘要 铜矿尾矿库是集中储存铜矿选矿废渣(尾矿渣)的人工构筑物,尾矿砂颗粒细小,积存量大,物相结构为松散堆积物,存在有害重金属、选矿药剂和废液,表面不能生长植被,风吹容易造成扬沙,污染大气、植被、水体、土壤。如防范措施不当,容易诱发滑坡、泥石流等次生地质灾害,存在重大环境安全隐患。尾矿库生态修复能够很好的解决以上问题,完成环境治理。 The tailings pond of copper mine is an artificial structure for centralized storage of the ore dressing waste (tailings slag).The tailings sand has small particles,large amount of accumulation,loose phase structure,harmful heavy metals,ore dressing agents and waste liquid,and no vegetation can grow on the surface.The wind blowing is easy to cause sand lifting and pollute the atmosphere,vegetation,water body and soil.If the preventive measures are not appropriate,it is easy to induce secondary geological disasters such as landslides and debris flows,and there are major environmental security risks.The ecological restoration of tailings pond can solve the above problems and complete the environmental treatment.
作者 周微 ZHOU Wei(Liangshan Mining Co.,Ltd.,Liangshan 615000,China)
出处 《世界有色金属》 2019年第18期290-290,292,共2页 World Nonferrous Metals
关键词 尾矿库 环境污染 生态修复技术 Tailings Dam environmental pollution ecological restoration technology
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部