丹江口库区某污水处理厂现状设计规模为1.5×104 m 3/d,二级处理采用循环式活性污泥法(CASS)工艺,出水水质执行国标一级B标准。提标改造工程设计规模为3.0×104 m 3/d,二级处理采用AAO/MBR工艺,设计出水水质执行准地表IV类水标准(TN≤15 mg/L,SS≤10 mg/L)。文中介绍了该工程的技术路线和改造经验、MBR膜池系统组成和设计要点、工程投资和经济分析,可供其他类似工程参考。
Cyclic activated sludge system(CASS)is used as the secondary-treatment process in a WWTP in Danjiangkou Reservoir area.The existing design capacity is 1.5×104 m 3/d and effluent quality meets the first grade B criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918—2002).The design capacity will be increased to 3.0×104 m 3/d after upgrading and AAO/MBR processes are adopted.The effluent quality is required to meet Class IV criteria specified in Quality Standards for Surface Water(GB 3838—2002)(TN≤15 mg/L,SS≤10 mg/L).Systematic exploration of treatment process,upgrading experience,composition and design essentials of MBR process,as well as project investment and operation cost are conducted in present work,which can provide references for related applications.
作者
郑立安
杨涛
ZHENG Li’an;YANG Tao(Central and Southern China Municipal Engineering Design and Research Institute Co.,Ltd.,Wuhan 430010,China;Wuhan Municipal Engineering Design and Research Institute Co.,Ltd.,Wuhan 430023,China)
出处
《净水技术》
CAS
2019年第12期22-26,共5页
Water Purification Technology
关键词
污水处理厂
提标改造
AAO/MBR工艺
设计要点
wastewater treatment plant(WWTP)
upgrading and reconstruction
AAO/MBR processes
design essential