期刊文献+

南水北调中线干线设计单元工程完工验收工作的思考

Completion acceptance of main structures of Middle Route Scheme of South-to-North Water Diversion Project
下载PDF
导出
摘要 在南水北调工程验收工作中,设计单元工程完工验收是南水北调验收工作中至关重要的环节,也是竣工验收的重要依据。结合南水北调中线干线设计单元工程完工验收工作实践,提出了目前设计单元工程完工验收中普遍存在的问题,对如何完善设计单元工程完工验收工作提出了措施及建议,以促进设计单元工程完工验收科学、规范、公正、有效地进行。 Check and acceptance is one of the key components for the completion of South-to-North Water Diversion Project, and also the basis for final check and acceptance. Based on practical experiences obtained during the check and acceptance of structures of Middle Route Scheme of South-to-North Water Transfer Project, recommendations are made for further improvement based on examination of common problems, so as to ensure successful completion of the project with conducting check and acceptance in scientific, standard, fair and effective ways.
作者 刘敬洋 张吉康 Liu Jingyang;Zhang Jikang
出处 《中国水利》 2019年第23期35-36,39,共3页 China Water Resources
关键词 南水北调中线干线工程 完工验收 验收管理 措施建议 Middle Route of South-to-North Water Diversion Project completion acceptance check and acceptance management measures and suggestions
  • 相关文献

参考文献2

二级参考文献7

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部