摘要
为了保障新车型外购零件开发的进度、质量和数量,文章提出了引入多阶段2TP工具,同时扩展5M1E分析方法中各要素包含的内容,并将多阶段2TP工具和扩展后的5M1E分析方法相结合,对重点零件的生产开发过程进行多次评价。同时根据项目节点和相应要求,总结出每个阶段的评价切入点,然后用以点带面的方式进行综合评价,从而推进供应商零件生产过程能力的提升。
In order to ensure the development progress,quality and quantity of the purchased parts of new vehicles,the multi-stage 2 TP tools is proposed in this paper,the contents of the elements in the 5 M1 E analysis method is extended,and then the multi-stage 2 TP tool is combined with the expanded 5 M1 E to evaluate the production process of key parts repeatedly. According to the project node and corresponding requirements,the evaluation cut-in point of each stage is summarized,and the comprehensive evaluation is carried out in a point-and-band way to promote the improvement of the production process capability of the suppliers.