摘要
近年来,随着国家电网公司电力体制改革年限的增加,电力体制改革也开始向纵深发展,同时国家要求电力企业的改革标准也越来越高,为积极响应国家改革号召,进一步提高电力企业电能供应质量,电力企业迫切需要优化电网设备的停送电流程,最大限度地缩短停电时间,提高供电可靠性。
In recent years,with the increase of the years of power system reform of State Grid Corporation of China,the electronic system reform has begun to develop in depth.At the same time,the state requires the reform standards of power enterprises to be higher and higher.Therefore,in order to respond to the call of national reform and further improve the power supply quality of power enterprises,power enterprises urgently need to optimize the power shutdown and transmission process of power grid equipment.Greatly shorten the outage time and improve the reliability of power supply.
作者
边伟
杨大春
张东海
霍晓峰
Bian Wei;Yang Da-chun;Zhang Dong-hai;Huo Xiao-feng
出处
《电力系统装备》
2019年第22期101-102,共2页
Electric Power System Equipment
关键词
地调管辖
冷备用
操作实践
land transfer jurisdiction
cold standby
operational practice