期刊文献+

火电厂运输胶带粘接工艺探析

Thermal Power Plant Transportation Tape Bonding Process
下载PDF
导出
摘要 本文着重探讨了硫化粘接的方法和原理、接头加工的几种方法以及加工步骤,根据不同接头方式如何计算接头长度,针对不同接头方式的特点分别对它们的优、缺点进行一一比较,还对如何配制胶浆、接头粘接的工艺流程做了详细的说明,并对在整个接头粘接过程中的技术要领以及施工注意事项、质量标准都作了概述。 This paper focuses on the methods and principles of vulcanization bonding,several different methods of joint processing and processing steps,how to calculate the joint length according to different joint methods,and the advantages and disadvantages of different joints.A comparison.The process flow of how to prepare the glue and joint bonding is also described in detail,and the technical essentials in the whole joint bonding process and the precautions and quality standards in the construction process are summarized.
作者 董卫明 Dong Wei-ming
出处 《电力系统装备》 2019年第22期156-157,共2页 Electric Power System Equipment
关键词 计算长度 接头加工 粘接方法 质量要求 calculated length joint processing bonding method quality requirements