期刊文献+

基于霍普菲尔德网络的云作业调度算法 被引量:4

The Scheduling Algorithm of Cloud Job Based on Hopfield Neural Network
下载PDF
导出
摘要 针对当前云作业调度效率不高,资源利用不够充分,尚不能发挥其最大优势,提出一种基于霍普菲尔德网络的作业调度算法。为了实现系统资源调度能力的提高,分析影响云作业调度相关资源的特点;建立资源条件约束数学模型,再设计霍普菲儿德能量函数,并对其优化;通过标准用例集进行测试分析9个节点的平均利用率,并与3个典型算法进行性能和资源利用方面的比较。实验表明,该方法在效率上较其它3个算法有显著提升。 Focusing on the low efficiency of cloud job scheduling and the insufficient utility of resource, a job scheduling algorithm based on Hopfield Neural Network is proposed. In order to improve the resource scheduling ability of the system, The resource characteristics which influence the cloud job scheduling are shown. The mathematical model of resource constraints is established, and the Hopfield energy function is designed and optimized. The average utilization rate of 9 nodes is analyzed by using the standard test cases, and the performance and resource utilization of the proposed strategy are compared with three typical algorithms. The results show that the average efficiency of the cloud job scheduling based on the algorithm is improved significantly.
作者 郭玉栋 左金平 Guo Yudong;Zuo Jinping(Network Information Center,Jinzhong University,JinZhong 030600,China;School of Information Technology&Engineering,Jinzhong University,JinZhong 030600,China)
出处 《系统仿真学报》 CAS CSCD 北大核心 2019年第12期2859-2867,共9页 Journal of System Simulation
基金 山西省高等学校科技创新基金(20171118) 山西省软科学计划研究基金(2016041008-6) 山西省高等学校教学改革创新项目(J2019183)
关键词 HADOOP 云调度算法 Hopfield neural network MAPREDUCE 优化算法 Hadoop cloud scheduling algorithm Hopfield neural network MapReduce optimization algorithm
  • 相关文献

参考文献6

二级参考文献67

  • 1金宏,王宏安,王强,戴国忠.改进的最小空闲时间优先调度算法[J].软件学报,2004,15(8):1116-1123. 被引量:25
  • 2张长水,阎平凡.解Job-shop调度问题的神经网络方法[J].自动化学报,1995,21(6):706-712. 被引量:38
  • 3[1]Zhang C S , Yan P F, Chang T. Solving Job-Shop Scheduling Problem with Priority Using Neural Network[J]. IEEE Int. Conf. Neural Networks, 1991: 1361-1366.
  • 4[2]Chang C Y, Jeng M D. Experimental Study of a Neural Model for Scheduling Job Shops[J]. IEEE Int. Conf. System, Man, Cybernetics, 1995, 1: 536-540.
  • 5[3]Yang S X, Wang D W: Constraint Satisfaction Adaptive Neural Network and Heuristic Combined Approaches for Generalized Job-Shop Scheduling[J]. IEEE Trans. on Neural Network, 2000, 11: 474-486.
  • 6[4]Huang Y M, Chen R M. Scheduling Multiprocessor Job with Resource and Timing Constraints Using Neural Networks[J]. IEEE Trans. on Syst., Man, Cybernetic, 1999, 29, 490-502.
  • 7[5]Hopfield J J, Tank D W. Neural Computation of Decision in Optimization Problems[J]. Biol. Cybern., 1985, 52: 141-152.
  • 8Jung H Y, Lee K M, Lee S U. Stereo matching using scanline disparity discontinuity optimization [C]// Proc of Advanced Concepts for Intelligent Vision Systems. Berlin: Springer, 2006:588-597.
  • 9Forstmann S, Kanou Y, Thuering S, et al. Real-time stereo by using dynamic programming [C] //IEEE Con on Computer Vision and Pattern Recognition Workshop. Piscataway, NJ: IEEE, 2004:29-29.
  • 10Boykov Y, Veksler (). Fast approximate energy minimization via graph cuts [J]. IEEE Trans on Pattern Analysis and Machine Intelligence, 2001, 23(11) : 1222-1239.

共引文献102

同被引文献52

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部