针对苏通GIL综合管廊项目气体处理设备的运输难点问题,通过分析管廊内上下半腔空间使用情况,给出了两种气体处理设备的布置及运输方案。通过对施工工期保证、施工作业组织及安全控制措施等方面的比较,最终选出最适合现场实际应用的解决方案。
In view of the difficult transportation of the gas treating equipment,in the Sutong GIL comprehensive utility tunnel project,this paper analyses the space usage of the upper and lower half cavity of the pipe gallery,gives two layout and transportation schemes of the gas treating eguipment.By comparison with construction period,construction operation organization and safety control measures,the most suitable solution for the field application is finally selected.
作者
路书军
倪向萍
王玉春
凌建
吴威
高亚平
戴大海
LU Shujun;NI Xiangping;WANG Yuchun;LING Jian;WU Wei;GAO Yaping;DAI Dahai(State Grid Corporation of China,Beijing 100031,China;Exchange Construction Branch of State Grid Corporation of China,Beijing 100052,China;Henan Pinggao Electric Co.,Ltd.,Pingdingshan 467001,China;Jiangsu Transmission and Transformation Co.,Ltd.,Nanjing 210037,China;State Grid Jiangsu Electric Power Co.,Ltd.,Nanjing 210008,China)
出处
《机械制造与自动化》
2019年第6期199-201,共3页
Machine Building & Automation
关键词
GIL
管廊
气体处理设备
布置方案
运输方式
GIL
pipe gallery
gas treatment equipment
layout plan