摘要
随着城市化进程的不断加快,市政改建工程也日益增加。更好的控制改建工程造价,避免出现"三超"现象十分重要。介绍了改建工程的特点,结合工程经验分析了改建工程在设计阶段造价的主要影响因素和产生的原因,针对容易引起造价增加的因素提出了相应控制造价的措施。
With the acceleration of the urbanization process, the municipal reconstruction projects are also increasing. It is very important to control the reconstruction engineering cost and avoid the phenomenon of super investment. This article introduces the characteristics of the reconstruction project, analyzes the main influencing factors and the causes of the cost of the reconstruction project in the design stage combined with the engineering experience, and proposes the corresponding measures to control the cost for the factors easily causing the cost increase.
出处
《城市道桥与防洪》
2019年第12期207-209,M0021,共4页
Urban Roads Bridges & Flood Control
关键词
市政
改建工程
设计阶段
造价控制
municipal
reconstruction project
design stage
cost control