坪山高新区综合服务中心项目屋面采用装配式叠式檐口系统,地面单元格装配式组装、整体吊装的工艺,实现了屋面檐口的快速施工建造。对装配式叠式檐口系统的工艺原理、工艺流程、主要施工技术要点及质量安全控制措施进行介绍,并分析该系统的优势。
Pingshan High-tech Integrated Service Center project adopts assembled stacked cornice system,rapid construction of roof cornice is realized by using the technology of assembly and integral hoisting of roof cells. The technological principle,technological process,main construction technology points and quality and safety control measures of the assembled stacked cornice system are introduced,and the advantages of the system are analyzed.
作者
孙晖
黄永宏
陈伟
张卉
SUN Hui;HUANG Yonghong;CHEN Wei;ZHANG Hui(China Construction Science&Technology Co.,Ltd.,Shenzhen Branch,Shenzhen,Guangdong 518000,China;China State Construction Development Co.,Ltd.,Beijing 100088,China;School of Communication,Shenzhen University,Shenzhen,Guangdong 518000,China)
出处
《施工技术》
CAS
2019年第22期1-3,共3页
Construction Technology
基金
国家重点研发计划:工业化建筑设计关键技术(2016YFC0701500)
关键词
装配式建筑
檐口
吊装
龙骨
施工技术
prefabricated buildings
cornice
hoisting
keel
construction