5HERROELEN W, REYCK B D, DEMEULEMEESTER E. Resource-constrained project scheduling: a survey of recent developments[J]. Computers and Operations Research, 1998, 25(4): 279-302.
6SHTUB Avraham, LEBlANC Larry J, CAI Ziyong. Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm[J]. European Journal of Operational Research, 1996, 88(1): 124-138.
7Etgar Ran, SHTUB Avraham, LEBLANC Larry J. Scheduling projects to maximize net present value-the case of time-dependent, contingent cash flows[J]. European Journal of Operational Research, 1997, 96(1): 90-96.
8AHN Taeho, ERENGUC S Selcuk. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure[J]. European Journal of Operational Research, 1998, 107(2): 250-259.
9KOGAN Konstantin, SHTUB Avraham. Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs[J]. European Journal of Operational Research, 1999, 118(1): 65-80.
10LUH, Peter B, LIU Feng, MOSER Bryan. Scheduling of design projects with uncertain number of iterations[J]. European Journal of Operational Research, 1999, 113(3): 575-592.