摘要 随着煤矿生产效率的提高,传统带式输送机逐渐不能满足综采工作面的生产需求,针对这一情况设计了一种基于PLC的带式输送机变频驱动系统。系统采用双电机驱动滚筒的方式实现皮带机的运转,提高了其运输距离与运输载荷。建立了带式输送机的启动曲线模型,并对其动态特性进行分析,设计了系统的总体结构方案与系统的控制原理。综合考虑工况环境后对控制器与变频器进行选型,并设计了两者的接线图,在软件部分设计了系统主程序的流程图。系统实现了输送机双电机的同步控制,增加了系统的可靠性,提高了运输效率。 With the improvement of coal mine production efficiency,the traditional belt conveyor can’t meet the production requirements of fully mechanized mining face.A PLC-based variable speed drive system for belt conveyor was designed.The system uses a double motor to drive the drum to realize the operation of the belt conveyor,which improves its transportation distance and transportation load.The starting curve model of the belt conveyor was established,and its dynamic characteristics were analyzed.The overall structural scheme of the system and the control principle of the system were designed.After considering the working condition environment,the controller and the inverter were selected,and the wiring diagrams of the two were designed.The flow chart of the main program of the system was designed in the software part.The system realizes the synchronous control of the conveyor double motor,which increases the reliability of the system and improves the transportation efficiency.
作者 郑海峰 ZHENG Haifeng(Yang Coal Group No.1 Mine,Yangquan,Shanxi 045000,China)
机构地区 阳煤集团一矿
出处 《机电工程技术》 2019年第11期202-204,共3页 Mechanical & Electrical Engineering Technology
关键词 带式输送机 变频驱动 PLC 同步控制 belt conveyor variable frequency drive PLC synchronous control
  • 相关文献

参考文献5

二级参考文献26

  • 1张嘉善.胶带输送机技术发展情况.山东矿业学院学报,1993,12(5).
  • 2Funke H. Zum dynamischen verhalten von Forderbandanlagen beim Anfahren und stillsetzen unter Berueksichtigung der Bewegungswiderstande[D].Hannover:TU Hannover, 1973
  • 3Funke H, Hartmann K, Lauhoff H. Design and Operating Performance of a Long-Distance Belt Conveyor System with Horizontal Curves and Simultaneous Material Transport in the Upper and Lower Strands[J]. Bulk Solids Handling, 2000, 20 (1): 45-55
  • 4Harrison A. Belt Conveyor Research 1980~2000[J]. Bulk Solids Handling, 2001, 21 (2): 159-164
  • 5Harrison A, Roberts A W. Technical Requirements for Operating Conveyor Belts at High Speed[J]. Bulk Solids Handling, 1984, 4(1): 99-104
  • 6Nordell L K. The channel 20 km overland-A Flagship of Modern Belt Conveyor Technology[J]. Bulk Solids Handling, 1991, 11 (4): 781-792
  • 7Nordell L K, Ciozada Z P. Transient Belt Stresses During Starting and Stopping; Elastic Response Simulated by Finite Element Method[J]. Bulk Solids Handling, 1984, 4(1):93-98
  • 8Lodewijks G. Non-Linear Dynamics of Belt Conveyor Systems.Bulk Solids Handling, 1997, 17(1): 57-67
  • 9Zur T W. Viscoelastic Properties of Conveyor Belts Modelling of Vibration Phenomena in Belt Conveyors During Starting and Stopping[J]. Bulk Solids Handling, 1986, 6(3): 553-560
  • 10Kim W, Park T, Lee S. Transient Dynamic Analysis of Belt Conveyor System Using the Lumped Parameter Method[J]. Bulk Solids Handling,1995, 15(4): 573-577

共引文献87

同被引文献56

引证文献11

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部