6Nitta, Izumi, Shibuya, Toshiyuki et al. Method and Apparatus for Esti- mating Man-hours [ P ]. JAPAN :JP 2007211760,2007.8.
7Foulds L R, Neumann K. A Network Flow Model of Group Technolo- gy[ J ]. Mathematical and Computer \ Modeling, 2003 ( 38 ) : 623- 635.
8MOHAMED M, MILLER A R. A database system of mechanical components based on geomet(ic and topological similarity[ J]. Com- puter-Aided ,2003,35 ( 1 ) :95-105.
9WANG Chengyao, WANG Dingwei, W. H. Ip, et al. The single ma- chine ready time scheduling problem with fuzzy processing time [ J ]. Fuzzy Sets and Systems,2002 ( 127 ) : 117- 129.