6[3]Maidl U.Geotechnical and mechanical interactions using the earth-pressure balanced shield technology in difficult mixed face and hard rock conditions[A].In:Proceedings of Rapid Excavation and Tunneling Conference[C].[s.l.]:[s.n.],2003.483-493.
7[4]Clough G W.EPB shield tunneling in mixed face conditions[J].Journal of Geotechnical Engineering,1993,119:1 640-1 656.